20.000 FRT Windmills loaded in Brake

08/29/2008
 

 
 

August 2008 / 20.000 FRT of wind power equipment were safely loaded onto M/V” Tian Wang Xing” at port of Brake for the Japanese port of Shimonoseki.  The Chinese MPP vessel operated by WU Shipping & Transport carries 13 complete sets of wind mills.
The booking was placed by COLI Hamburg whilst COLI Bremen took over the agency activities and ensured that loading operations went well, thanks to good cooperation with J.Mueller Terminals in Brake.


 

 
«go one site back»