2 lots of Heat Exchanger modules for Uhde GmbH

01/09/2009
 

January 2009 / Totally 10 heat exchanger modules with up to 12 m height and 147 mtons unit weight were

safely shipped from AMBAU private pier in Bremen, Germany to an overseas jobsite of Uhde GmbH in

Dortmund, Germany.

 

The impressive modules were loaded in 2 lots in vertical position for under deck stowage on board of MV”Deltuva” (End Sept) and MV”Nicolas” (End Nov) of ONEGO Shipping, respectively. 

 


COLI Bremen brokered the 2.200 FRT consignment on behalf of LS Cargo and also took care of port handling

at load port for both lots. All modules arrived at the port of destination in good condition.

                                                                                                                                                                                          


 

 
«go one site back»